Employer: Cuu Long Joint Operating Company (CLJOC)

EPC Contractor: PTSC MC

Duration: 7/2026 -12/2026

Description of project:

Su Tu Trang Phase 2B Field Development Project (“PROJECT”) consists of both Greenfield and Brownfield upgrade works which will involve integration between existing ST-PIP /WHP-C platforms bridge-linked with the new Central Gas Facility platform (ST-CGF).

The topsides are designed as an integrated frame for float-over installation with weight not to exceed of 8,500 metric tons.

 

Sao Vang E&C is subcontractor of PTSC MC. Sao Vang E&C’s scope is fabricated part of structure Decks of STT Topsides (Total 560 tons)