Employer: Murphy Cuu Long Bac Oil Co, Ltd.
EPC Contractor: PTSC M&C
Subcontractor: Sao Vang E&C
Duration: 5/2026 – 6/2026
Description of project:
Fabrication Grillage and Sea fastening for Lac Da Vang Platform

Sao Vang E&C is subcontractor of PTSC MC. Sao Vang E&C’s scope is fabricated Grillage and Sea fastening (Total 560 tons) for Topsides/Compressor Module/Flare boom.
